Dry process of bored pile merit

 v  Reduce the vibration of building Or building side.
 v  Can be narrow in places. Or with limited height.
 v  Used to modify the original building foundation settlement. Or replaces the factory.
 v  Drilling piles arranged in a position do the exact location. With very few errors.
 v  Large bored piles, the weight bearing significantly. The floor plan of the building was extensive. Including the preparation of underground tank in the building easier.
 v  Handling equipment. As well as the installation is fast moving to the area when the construction. Can start working immediately.